1·Be responsible for the total management, maintenance, stacking and work safety of the tailing dam.
负责好尾砂坝的全面管理维护,堆积和安全生产。
2·Among the factors affecting the safety of upstream method-tailing dam the seepage field is one of the most important.
影响上游法尾矿坝安全的各种因素中,渗流场是极为重要的因素之一。
3·Some deformation surveying methods are used in the safety monitor of tailing dam in the operation period in this paper.
将现有的各种变形测量的方法用于尾矿坝运行期间的安全监测,并叙述了相关的数据处理方法,具有重大的现实意义。
4·The test results provide basic data for the stability evaluation of the Yangla copper tailing dam under a magnitude 8 earthquake.
为羊拉铜矿尾矿坝在8度地震作用下的稳定性分析提供了基础资料。
5·Control of saturation line is one of important points in tailing dam monitoring, which plays an important role in tailing dam safety.
浸润线的控制是尾矿库监测重点内容之一,对尾矿库安全起着至关重要的作用。
6·It is pointed out that safe sealing for the flood drainage system of the tailing dam has a direct influence on the safety of the tailing dam.
指出尾矿库的排洪系统能否安全封堵直接影响到尾矿库的安危。
7·Frequently check the drainage chute in the back part of the tailing dam, clear away the soil and stone, etc. on its both sides to avoid entry into the chute.
尾砂坝后部排水斜槽,要经常检查,清理两边的土、石等物防止进入槽内。
8·It used for slope monitoring, such as the open pit slope, the dump, the tailing dam, and so on, and also achieve the point and surface deformation monitory of slope.
研究结果表明,基于多基线近景数字摄影测量技术的边坡变形监测是科学可行的,可用于各种边坡的监测,如露天矿边坡、排土场、尾矿坝等,能实现边坡点和面的变形监测。
9·To monitor the height oftailings dam and forecast its trend, a designed method based on gray system theory to create the model of tailing dam saturation line is presented.
为了实现对尾矿坝浸润线高度进行实时在线监测及趋势预测,提出了用了灰色系统理论来对尾矿坝的浸润线数据建立灰色模型的方法。
10·The calculation methods for common dam-break water flow are studied, such as the average width of dam-break, the maximum flow at tailing dam and the flow graph at tailing dam.
研究了常见溃坝水流计算方法,例如溃口平均宽度、坝址最大流量、坝址流量过程线等。